Skip to article
← All field notesSoftware buying

DMC software cost: first-year quote worksheet

Add required subscriptions, setup, retained tools and overlap. Keep unquoted charges open and staff hours separate.

Hot-air balloons above an East African savannah at dawn

What belongs in your first-year DMC software cost?

To compare DMC software costs, add the first 12 months of required subscriptions, confirmed setup charges, required add-ons, retained tools and transition overlap. Record usage charges separately with their assumptions. Leave unquoted items open, with an owner and a next action. Keep staff preparation hours separate from the cash total.

A monthly headline price cannot tell you the whole commitment. A per-user plan, a user-band plan and a bundle with usage allowances need different calculations. This worksheet helps you reconcile written quotes for the same required workflow before deciding what to buy.

Set the workflow and the tools that stay

Write one sentence describing the work you need covered: for example, three colleagues handling enquiries, preparing tailor-made itineraries and handing confirmed trips to operations. List the required tasks and name the tool that will cover each one. Check workflow fit first with our tour operator software comparison; test itinerary requirements with the trip builder buying guide.

Include accounting, payment collection, currency work and any specialist itinerary tools that must stay. Remove an existing subscription from the budget only after you have checked that its required work is covered and its cancellation date is known. A replacement subscription can begin before the old one ends.

Read the billable unit before the headline price

Official pricing pages illustrate why the unit matters. Tourwriter plans publish per-user annual billing, itinerary allowances and a separate setup charge. DMC Pilot pricing lists included seats, active programs and storage, with charges for extras; onboarding is paid and priced separately. These are published terms, not our test of either product. Check the current page and obtain written terms for your team.

For each quote, record the currency, billable unit, included allowance, number of units and billing commitment. Ask what counts toward a limit and when it resets. If the price is displayed per month but paid annually, record both the annual commitment and the invoice timing. Ask about seasonal peaks rather than budgeting only for an average month.

Copy this register once for every cost line

Use one copy for the subscription, then another for each setup service, add-on, retained tool and overlap charge. This is a manual purchasing worksheet, not an Tripshaped feature. Store the source or quote reference where your purchasing team can check it.

First-year quote register: repeat for each cost line
FieldYour record
Requirement and toolTask covered: ___; vendor/tool and plan: ___
Period and currencyFirst-year start/end: ___; billing currency: ___
Unit and allowanceSeat/band/bundle/usage unit: ___; included quantity and reset: ___
CalculationUnit price: ___ × billable quantity: ___ × applicable periods: ___
Commitment and invoice timingMonthly/annual commitment: ___; payment dates: ___
Cost classificationRecurring / one-off / conditional usage / retained tool / overlap: ___
EvidenceSource URL or written quote reference: ___; checked date and expiry: ___
Coverage statusIncluded / excluded / not quoted: ___; separate amount if confirmed: ___
Accountable reviewerName: ___; next action: ___; answer due: ___
Open chargeWhat is missing: ___; do not enter zero without evidence

Reconcile cash, conditions and open questions

Group confirmed recurring charges and confirmed one-off charges into separate subtotals. Add them for a known first-year cash subtotal in a single currency. Show conditional usage charges beside that subtotal, with the quantity assumption and applicable rate. Show unquoted charges in an open-items list outside the number.

For an annual invoice, count the annual amount once; do not multiply it by 12 again. Avoid counting an included service as a separate add-on. Keep taxes or transaction fees unresolved until the applicable treatment is confirmed. If quotes use different currencies, retain separate totals until your team records a dated budgeting conversion basis. That budgeting step does not establish any software currency-conversion capability.

Alongside the register, write down invoice dates and amounts. Two equal annual totals can require different cash at signing. Ask a second colleague to reproduce each calculation and check that every required task has either a confirmed cost or an explicit open question.

Worked example: a smaller known subtotal can still be incomplete

All figures below are invented teaching inputs in demo units. They are not vendor prices, market estimates, customer records or Tripshaped savings. Both fictional options cover an assumed workflow; actual capability fit still needs checking. Each subscription runs for 12 months.

Fictional first-year reconciliation, one currency of demo units
Cost lineOption AOption B
Required subscription100 × 3 seats × 12 = 3,600250 bundle × 12 = 3,000
Retained tool20 × 12 = 24020 × 12 = 240
Transition overlap50 × 2 months = 10050 × 2 months = 100
Confirmed recurring subtotal3,9403,340
Confirmed setup500Not quoted; open
Known cash subtotal4,4403,340; incomplete
Conditional usageAssumed none for this rehearsalAssumed none for this rehearsal
DecisionConfirm scope and written termsObtain onboarding quote before comparison

Option A reconciles as 3,600 + 240 + 100 + 500 = 4,440. Option B reconciles as 3,000 + 240 + 100 = 3,340 before onboarding. The known subtotals differ by 1,100 demo units. That difference is not a saving: Option B has an unresolved required charge. Neither option is a complete real purchase budget.

In this rehearsal, onboarding is the only open cash line. For a real quote, assign every other unresolved required charge to a reviewer too. Do not mark the budget complete simply because one missing amount arrives.

Budget staff preparation in hours

Use a separate effort register: task, responsible person, estimated hours, basis and review date. Cover source-data cleanup, supplier-rate preparation, training and acceptance checks. Budget the preparation work using the travel CRM migration guide; this article does not replace its record-mapping and cutover checks.

For example, a fictional agency might allocate 8 hours to data preparation, 6 to training and 4 to checks: 18 staff hours. Those are teaching assumptions, not a migration estimate. If you assign an internal hourly cost, disclose your own rate and show that calculation separately. Time released from another task is not automatically cash saved.

Ask what changes at renewal, growth and exit

Before signing, ask for written renewal pricing or its calculation basis, notice dates, plan-change rules and the treatment of added or removed users. Confirm what happens when usage exceeds an allowance, whether spending can be capped and what happens when a limit is reached.

Ask which records and issued documents you can export, in what format, at what charge and for how long after cancellation. Assign an owner to test whether that output meets your requirements. Record the answers as purchasing evidence; do not assume a public feature list settles your contract.

Choose the scope that fits your agency

Keeping controlled existing tools is a fair option if they meet the requirements and someone owns the handoffs. An itinerary tool alongside an existing CRM and accounting system may also fit. Compare that combined cost and staff effort with an integrated operator workspace; a wider feature list alone does not justify replacing the stack.

Tripshaped Agency OS connects an enquiry to one Trip with itinerary, Proposal and Booking, using reusable Contacts and Inventory. Customers confirm directly with the agency, and an authorized person creates the Booking. Shared links are read-only. Tripshaped does not process customer-agency payments or convert currencies, so keep those requirements and any retained tools in your budget.

Check the verified workflow on Tripshaped Agency OS and request written terms for your actual team and required scope. Do not assume automatic imports, a fixed migration time or autonomous commitments. Bring the worksheet and unresolved commercial questions to a demo.

Does an unlisted setup fee mean setup is free?

No. Mark it not quoted and ask for written confirmation of what setup includes and what it costs. Count zero only when the relevant scope is explicitly included without a separate charge.

Should software cost include staff time?

Record staff effort, but keep its hours and any internal valuation separate from vendor cash payments. This makes preparation work visible without presenting it as an invoice or a promised saving.